Skip to content
MYRALBE
← Myralbe Insights

Industry analysis

Grid congestion in Europe: selling industrial flexibility

A constrained electricity connection can delay an otherwise viable industrial investment. For flexibility technology suppliers, the opportunity starts with understanding what the customer needs to operate, when it needs power and which constraints can be managed.

Electrical substation and transformer beside a large industrial facility.

An industrial expansion can be ready on paper while its electricity supply remains unresolved. The company may have selected a production line, identified a building and established demand for its products. Yet the additional power cannot be drawn when the operation needs it.

For suppliers of energy management systems, industrial controls, flexible charging and storage, this changes the commercial conversation. A delayed investment can reveal a specific need: helping the customer make better use of the electrical capacity available to its site.

The value of the technology depends on the operating problem it can address. Understanding that problem should come before an equipment proposal.

The customer experiences congestion through its business

Grid congestion becomes tangible when it postpones a production line, restricts fleet charging or complicates the replacement of a fuel-fired process with an electrical alternative.

Each situation requires a different assessment. A brief peak caused by several loads operating together may offer scope for sequencing. Vehicle charging that can move to another period presents a scheduling opportunity. Continuous demand above the available connection capacity raises a different set of questions.

A useful first discussion should establish the planned operation, additional power requirement and time pattern of demand. It should also clarify the existing connection terms and the network operator’s response to any expansion request.

Operational flexibility has a cost as well as a potential benefit. Moving a production activity could affect staffing, delivery commitments or process quality. Changing a charging schedule could affect vehicle availability. The customer’s operations team needs to establish which adjustments are acceptable.

That information gives a supplier a basis for deciding whether its product has a credible application.

Flexibility needs an operating agreement

The Netherlands offers a practical example of how this relationship is developing. Stedin’s capacity-steering contracts allow businesses to agree adjustments to electricity consumption or export within specified limits and time windows. The operator communicates the required adjustment, while the customer remains responsible for meeting the agreed conditions.

For suppliers, the commercial implication is that measuring and controlling demand can become part of an operating commitment. A customer considering such an arrangement needs to understand how the proposed technology would translate an instruction into an acceptable change at the site.

The discussion should establish which equipment can respond, who authorises changes and how performance will be checked. Communication failures and unexpected production requirements also need to be considered by the technical team.

Storage may form part of the response. A suitably designed battery can support site demand during selected periods while imports remain within an agreed limit. Its usefulness depends on charging opportunities, available energy, discharge duration and the rest of the installation.

Those conditions matter to the network as well. Stedin’s storage guidance explains that batteries can contribute to congestion if their operation is poorly aligned with network conditions. It describes additional agreements covering temporary capacity restrictions and how storage should be used.

A low electricity price at a particular hour therefore does not establish that the local network can accommodate additional charging at that time.

Spain requires its own assessment

The Dutch experience offers useful questions for suppliers developing business in Spain. Each opportunity still needs to be assessed against its own network, connection and operating arrangements.

On 1 October 2026, Red Eléctrica published a demand-access map showing consumption categories, geographical distribution and the status of capacity granted or under consideration. The publication explicitly excludes requests to distribution networks.

That distinction matters commercially. Transmission information can help suppliers understand where demand is developing. A factory connected to a distribution network still requires investigation of its own connection and the relevant operator.

National figures are a starting point for market research. The purchasing opportunity emerges from the circumstances of a particular business: what it wants to change, what is preventing that change and whether an acceptable technical response exists.

Build commercial activity around a defined requirement

A useful target account combines a credible operational need, a documented electricity constraint and people willing to assess a response.

The first conversation should establish what is delayed and why. Further discussions should involve the people responsible for the industrial process and electrical installation. Depending on the application, an engineering company, charging specialist, system integrator or energy-services provider may also influence the purchase.

For a supplier entering a new market, identifying those relationships is part of the commercial work. So is following the opportunity when the customer needs additional evidence, revises its operating plan or changes the scope of its investment.

Myralbe’s sales and market development approach connects account research, direct engagement, qualification and continued commercial follow-up. We help establish where a product fits, reach the organisations involved and coordinate the discussions needed to progress an opportunity.

For industrial flexibility suppliers, a focused market approach starts with the applications their technology can credibly support. That gives prospective customers a clear reason to engage and gives the supplier a more useful basis for investing commercial resources.

Does your company supply industrial controls, energy management, flexible charging or storage technology? Contact Myralbe with your applications and target markets to discuss commercial development in Spain, Portugal or France.

Related articles and services